New construction

The cheapest generator install happens before drywall

Retrofitting standby power means trenching a finished yard, chasing conduit through closed walls, and living with whatever pad location is left. Specified at the plan stage, the same system costs less, looks better, and lands exactly where it belongs.

Electrician installing a transfer switch and panel during new construction

Load profile

What gets decided at the plan stage

Pad and setbacks
Location fixed against exhaust clearance, window and door setbacks, snow shed, and drifting patterns, before landscaping.
Conduit and feeder routing
Runs placed in open trench and open wall, sized once for the final generator rather than the starter unit.
Fuel infrastructure
Gas line and regulator sized for generator demand on top of appliance demand, or the propane tank placed and permitted correctly.
Panel architecture
Critical loads grouped onto a dedicated sub-panel from day one, so transfer is clean and load management is simple.
Transfer switch provision
ATS location, service-entrance rating, and meter coordination handled with the utility during service application.
Generator-ready option
Full infrastructure now and the unit later, a common approach when budget is staged across phases.

Equipment class

Common new-construction approaches

Whether the generator ships with the house or two years later, the infrastructure decision belongs to this phase.

Infrastructure only

Generator-ready rough-in

Pad, conduit, gas stub, and ATS-ready panel. Adding the unit later becomes a one-day job instead of a project.

14 – 26 kW

Single-family standby

Complete air-cooled system integrated with the electrical package and commissioned at final inspection.

150 kW+

Commercial build

Coordinated with the engineer of record: switchgear, fuel storage, life-safety separation, and witnessed commissioning.

Process

Working with your build team

01

Plan review

We read the electrical and mechanical set and mark up generator, conduit, and gas requirements.
02

Trade coordination

Scheduled against the GC's timeline so trenching, framing, and gas rough-in happen once.
03

Rough-in

Pad, conduit, and ATS installed with the rest of the electrical package.
04

Set & commission

Unit set, connected, load tested at final, and handed over with a maintenance plan in place.

Bring us in at the plan stage

Send the electrical set and your target timeline. We'll mark up the generator provisions and price both the rough-in and the complete system.